![Highway development projects](https://cdnpreprodanteagroup.blob.core.windows.net/prod/media/resized/8/6e684d90-e57c-4832-b1cf-6ebdbdb86775/autox580_pexels-kelly-lacy-2495407.jpg)
Highway development projects
Do you have any questions?
Highways projects
![Highways projects](https://cdnpreprodanteagroup.blob.core.windows.net/prod/media/resized/8/be3e26e5-0360-4a14-b4b1-186a976dc92a/360xauto_pexels-pok-rie-2876564.jpg)
![Highways projects](https://cdnpreprodanteagroup.blob.core.windows.net/prod/media/resized/8/fb5ecb55-edbc-4832-846c-854991fe12ff/360xauto_pexels-kelly-lacy-2519383.jpg)
![Highways projects](https://cdnpreprodanteagroup.blob.core.windows.net/prod/media/resized/8/8b48c7c1-9c2c-49ed-905e-4eef8c8030d6/360xauto_pexels-kelly-lacy-2833724.jpg)
Our track record in highway infrastructure development
Project |
Client |
Project details |
128.600 kms, 4-lane carriageway, NH-2, West Bengal |
National Highways Authority of India |
Independent Consultant during Operation & Maintenance of 4-lane divided carriageway facility constructed on BOT (Annuity) of Panagarh – Palsit – Dankuni section from km. 517.000 to km. 645.600 of NH-2 in the state of West Bengal |
Dual carriageway, 4-lane in Uttar Pradesh |
National Highways Authority of India |
Consulting Services as Independent Engineer during Operation & Maintenance and fee collection of 4-lane dual carriageway from Km. 52.250 to Km. 131.000 of NH-58 (Meerut-Muzaffarnagar Section) in the State of Uttar Pradesh on Build, Operate and Transfer (BOT) basis through a Concessionaire |
2 laning of NH-215, Orissa |
National Highways Authority of India |
Independent Engineer services for Four/Two-Laning of Rimuli-Roxy-Rajamunda Section of NH-215 from km 163.000 to km 269.000 (design chainage km 163.000 to km 259.453 km) in the State of Orissa on Design, Build, Finance, and Transfer (Toll) Basis under NHDP-Phase-III |
4 lane NH-1, Amritsar-Wagah border |
National Highways Authority of India |
Consultancy Services as Independent Consultant during Operation & Maintenance period for the work of 4-laning of Amritsar – Wagah Border Section of NH-1 from km 455.400 to km 491.620 on BOT (Annuity) basis under NHDP Phase-IIIA in the State of Punjab through the Concessionaire. |
NH-4 highway, Karnataka |
National Highways Authority of India |
Consulting Services as Independent Engineer during Operation & Maintenance and fee collection of Access Control Highway from km 10.00 to km 29.50 of Bangalore – Nelamangala Section of NH-4, in the State of Karnataka on Build, Operate and Transfer (BOT) basis through a Concessionaire (Package No. Kar / O&M/IC-4/2011) |
NH-40 Meghalaya-Assam |
National Highways Authority of India |
Independent Engineer services for Four Laning of Jorbat – Shillong (Barapani) Section of NH–40 from km 0.000 to Km. 61.800 of NH- 40 in the State of Meghalaya and Assam on DBFOT(Annuity) basis under SARDP-NE on DBFOT Basis under NHDP-Phase-III |
4-lane dual carriageway, Jalandhar-Amritsar section |
National Highways Authority of India |
Consulting Services as Independent Consultant during Operation & Maintenance and fee collection of 4-lane dual carriageway from km. 407.100 to km. 456.100 of NH-1 (Jalandhar-Amritsar Section) in the States of Punjab on Build, Operate and Transfer (BOT) basis through a Concessionaire |
NH-7 AP-Karnataka border highway |
National Highways Authority of India |
Consulting Services as Independent Engineer during Operation & Maintenance for km. 463.600 (AP / Karnataka Border) to km 524.000 (Avathi Village), km 524.000 (Avathi Village) to km 534.720 on NH-7 in the State of Karnataka on Build, Operate and Transfer (BOT) Annuity basis through a Concessionaire (Package No. Kar / O&M/IC-1/2011) |
4-lane carriageway, Belgaum Maharashtra border |
National Highways Authority of India |
Consulting Services as Independent Engineer during Operation & Maintenance and fee collection of 4 lane divided carriageway facility of Belgaum – Maharashtra Border Section from km 515 to km 592 of NH-4 in the State of Karnataka on BOT (Annuity) basis through a Concessionaire (Package No. Kar / O&M/IC- 3/2011) |
6-lane highway, Belgaum-Dharwad |
National Highways Authority of India |
Independent Engineer Services for 6 Laning of Belgaum – Dharwad Section of NH-4 from km 433.00 to km 515.00 in the State of Karnataka to be executed as BOT (Toll) on DBFOT Basis under NHDP Phase – V (Package No.: Kar / Phase – V / IC – 4 / 2010) |
Quality control consultant for construction, Sidhwan canal |
Punjab Infrastructure Development Board |
Independent Quality Control Consultant for Construction of 4-laning of road along Sidhwan Canal with Flyovers, Underpass, ROBs and Canal Lining (Doraha to Ludhiana-Ferozepur Road) i.e. Southern Bypass, Ludhiana |
Consultancy for Gwalior-Jhansi highway |
National Highways Authority of India |
Independent Consultancy Services for Rehabilitation and Up gradation to four lane of Gwalior-Jhansi of NH-75 from Km 16.00 to Km 96.127 in the State of Madhya Pradesh/Uttar Pradesh |
Engineering services for NH3 Khalghat-Maharashtra border |
National Highways Authority of India |
Independent Engineering Services for 4/6 laning of Khalghat to MP/Maharashtra border section of NH-3 in the State of Madhya Pradesh on BOT basis under NHDP – Phase II A. Details of Bridges: Sanjay Setu High Level Bridge at Narmada River = 768m, Borad River Bridge = 171., Goi River Bridge = 133m |
Construction of 4-lane Gwalior bypass |
National Highways Authority of India |
Independent Engineer Services for Construction of 4 lane Gwalior Bypass, Km 0.00 to Km 43.00 – connecting Km 103.00 of NH-3 & Km 16.00 of NH-75 in the State of Madhya Pradesh |
NH-33 Hazaribagh-Ranchi highway, Jharkhand |
National Highways Authority of India |
Independent Engineer Services for 4 laning of Hazaribagh – Ranchi Section of NH-33 from km 40.500 to km 114.000 in the State of Jharkhand under NHDP Phase – III on DBFOT (Annuity) Basis (Consultancy Package No.NHAI/BOT/11019/19/04 ) |
4-lane divided carriageway of Neelamangala-Tumkur highway, Karnataka |
National Highways Authority of India |
Consulting Services as Independent Engineer during Operation & Maintenance and fee collection of 4-lane divided carriageway of Neelamangala-Tumkur Section of BOT Basis from km 29.5 to km 62 of NH-4 in Karnataka State |
2-laning of Forbesganj-Jogbani highway, Bihar |
National Highways Authority of India |
Independent Engineering services for 2 laning of Forbesganj – Jogbani Section of NH-57A from km 0.000 to km 9.258 in the State of Bihar on DBFOT Basis under NHDP Phase – III |
Construction supervision of 3 packages of 4-lane highway, Gujarat |
National Highways Authority of India |
Consultancy Services for Construction Supervision of existing 2–lane road to 4-lane of 3 Packages: Package-IV, Garamore – Samakhiyali and Samakhiyali Gagodhar Road Section of NH-8A and NH-15 (Length 90.3 km); Package-V, Gagodhar to Radhanpur Section of NH-15 (length 106.2 km); and Package-VI, Radhanpur – Deesa Section of NH-14 (Length 85.4 km); East West Corridor Project, ADB Funded (Loan No. 1944 –IND) in the State of Gujarat. Bridge Length-1262.9m; Bridge Length-558.30m |
Construction supervision of 6-lane & 8-lane highway, Delhi |
National Highways Authority of India |
Consultancy Services for Construction Supervision of the Balance Work of (i) 6 laning of Km. 44.30 to 66.00 of NH-1 in the State of Haryana (Contract Package NS-17/HR-bal) and (ii) 8 laning from Km. 16.500 to Km. 29.300 on NH-1 in the State of Delhi (Contract Package No. NS-18/DL (Re-Bal) |
Construction supervision of Panipat-Panchigujaran highway, Haryana |
National Highways Authority of India |
Construction Supervision of 6- laning of Km 66.23 to Km 86.00 of Panipat-Panchigujaran in the State of Haryana, Package- CS-89/HR |
Project manajgement of Surat Bus Rapid Transit System (BRTS), Gujarat |
Urban Mass Transit Company Ltd |
Project Management Consultancy Services of 4 laning of Surat Bus Rapid Transit System (BRTS) Project in Gujarat; 4 Lane Flyover at Aai Mata Junction: 725m including approaches; 4 Lane Flyover at Kharvar Nagar Junction: 551.94m including approaches |
BRTS & elevated road, Rajkot, Gujarat |
Urban Mass Transit Company Ltd |
Project Management Consultancy Services of 4 laning of Pilot BRTS Corridor from Gondal Bypass to Madhapar Circle on Rajkot Ring Road and Design & Construction of Elevated Road over KKV & Indira Gandhi Circle along Rajkot Ring Road |
Road rehabilitation project, Chattisgarh |
PWD, Govt. of Chattisgarh |
Consultancy Services for Design, Procurement and Construction Supervision for Rehabilitation of Phase-II roads – Package A Chhattisgarh State Roads Sector Development Project(ADB) |
Upgradation works, Jhajjar district, Haryana |
Haryana State Roads & Bridges Development Corporation Ltd |
Supervision Consultancy Services for the work of Improvement of JhajjarDhaurBeri Road, BahadurgarhBeriKalanaur Road DighalBeriJahazgarh Road in Jhajjar District |
Quality control & construction, Madhya Pradesh |
Madhya Pradesh Road Development Corporation |
Construction Supervision and Quality Control Services for Sagar-Damoh-Jabalpur & Madla-Kanha Road from Km 98.00 to Km 157.00in the State of Madhya Pradesh |
4-laning of Jalandhar Pathankot highway |
National Highways Authority of India |
Construction Supervision of Four laning of Km 4.23 to Km 26.00 of Jalandhar-Pathankot Section of NH-1A |
Feasibility studies & DPR for highway development
Project |
Client |
Project details |
NH-71A Panipat-Rohtak, Haryana |
National Highways Authority of India |
Consultancy Services for Preparation of Feasibility-cum-Preliminary Design for 4/6 laning of Panipat-Rohtak Section of NH-71A in the State of Haryana on DBFO Pattern under NHDP Phase-III to be executed as BOT (Toll) Project (Package No.NHAI/BOT II/DPR/12) |
Jabalpur Ring Road, Madhya Pradesh |
National Highways Authority of India |
Consultancy Services for Feasibility Study and Detailed Project Report for 4 laning of Jabalpur Ring Road around Jabalpur Town and Jabalpur Flyover in the State of Madhya Pradesh under BOT (Annuity) Basis. |
Rehabilitation & upgrading of Amarwara-Umranala, Madhya Pradesh |
National Highways Authority of India |
Consultancy Services for Preparation of Detailed Project Report for Rehabilitation and Upgrading to 2 lane with paved shoulders configuration of Amarwara – Umranala section including bypass for Chindwara in the State of Madhya Pradesh (Package No.DPR/MP/SP-2) |
Rehabilitation of roads, Chhattisgarh state |
PWD, Govt of Chhattisgarh, Raipur |
Consultancy Services for Design, Procurement and Construction Supervision for Rehabilitation of Phase-II roads – ADB project, Chhattisgarh State Roads Sector Development Project |
NH-75 Gwalior-Jhansi, MP & UP states |
National Highways Authority of India |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Gwalior-Jhansi Section of NH-75 (Km 0.0 to Km 103.0) in the State of Madhya Pradesh and Uttar Pradesh Sindh River Bridge: 350m long |
NH-31 Highway in Bihar |
National Highways Authority of India |
Consultancy Services for Feasibility and preparation of Detailed Project Report for rehabilitation and upgrading of existing 2 lane road to 4 lane divided carriageway configuration from Km 153.3 to km 270 of Khagaria – Bakhtiarpur stretch of NH-31 in the state of Bihar (Contract Package No.NN/DL3/2). Under selected stretches of National Highways under 10,000 km (NHDP –Ph-III) programme. MOKAMA Bridge over river Ganga, 1.845 Km long Budi Gandak Bridge, 270m long |
NH-52 Tejpur-Halem, Assam |
National Highways Authority of India |
Consultancy Services for Feasibility Study and Detailed Project Report for 4/6 laning from Tejpur – Halem section of NH-52 in the State of Assam under NHDP Phase III programme JiaBharali River: 549m long Buroi River: 286m long Borgan River: 257m long Ghiladhari River: 107m long |
Rehabilitation & upgrading of NH-1A, Jalandhar-Pathankot, Punjab |
National Highways Authority of India |
Consultancy Services for Preparation of Feasibility Study and Detailed Project Report for Rehabilitation and upgrading of existing 2 lane road to 4 lane divided carriageway from Km 4.23 to Km 26.00 of Jalandhar – Pathankot Section of NH-1A in the State of Punjab |
4-laning of NH-2, Khaga to Varanasi, UP state |
National Highways Authority of India |
Preparation of Detailed Project Report for 4 laning and strengthening of section of NH-2 (Package III), from the existing two lanes, from Khaga to Varanasi (km 115 to km 317) |
4-6 lane divided carriage way NH-4 of Haveri-Belgaum, Maharashtra Karnataka border |
National Highways Authority of India |
Feasibility Study and DPR 4/6 lane divided carriageway of Haveri – Belgaum – Maharashtra border, section of NH-4(Package 8) in Karnataka State |
Rehabilitation & upgradation of East-West corridor |
National Highways Authority of India |
Consultancy Services for Preparation of Feasibility Study and Detailed Project Report for Rehabilitation and Upgradation to 4/6 lane divided carriageway configuration of East-West Corridor in the State of Gujarat/Rajasthan/Madhya Pradesh/Uttar Pradesh/Assam under ADB Loan Assistance Programme – Package-V (Jhansi to Junction of NH-2 km 100 to km 255 of NH-25 in the State of Madhya Pradesh |
Know more about this project
![Antea Group India](https://cdnpreprodanteagroup.blob.core.windows.net/prod/media/resized/8/69741492-e84e-4dca-a3bf-aa058e962111/autox70_news123-min.png)
You are using an old version of Edge.
Please note some functionalities might not be supported in this version of Edge.
Download the latest version here